Infrastructure
Erosion: Mild
Street/Road:
- flood-water
Drainage
Drainage Ditch Overflow: none
Debris
Debris/Trash: Present
Buildings
Impacts to Buildings: Y
Street: Long Beach Dr.
Specific Damage: Water flow around or under buildings
Cost incurred?: Yes
You must be logged in to post a comment.