Nottingham, MD (Cherwin Ave)
Baltimore County
Storm Reporter Report
01/09/2024 | 10:31 pm
Damage Reported
Infrastructure
Street/Road:
- Impacted, but passable
Drainage
Storm Drain Overflow: No storm drain present
Drainage Ditch Overflow: No drainage ditch present
Debris
Debris/Trash: Present
Buildings
Impacts to Buildings: Report Impacts
Street: Cherwin Avenue
Specific Damage: Water flow around or under buildings
Cost incurred?: Yes
Est. cost ($): 2050
You must be logged in to post a comment.
"The $2050 cost includes a $1250 ins ded. Our homes property was not leveled correctly by army core of engineers and we get flooding often. But this was the worst, 3.5 feet of water"