Photo description: Regular Occurrence - The parking area near WHYC and entrance to Napatree Point is flooded by high tide.
Project elevation:
- between MHW and mean low water (MLW)
Coastal infrastructure present at site:
- bulkhead/seawall
- parking lot
Displaced/unanchored and degraded project materials:
- none
Human impacts at project site:
- foot traffic
- vehicles
You must be logged in to post a comment.