Photo description: Allins Cove Barrington
Coastal resources in/directly adjacent to project footprint:
- coastal bank
- tidal river
Project elevation:
- above mean high water (MHW)
Coastal infrastructure present at site:
- multi-use path or road
Site stability:
- stable
Vegetative cover of project area:
- dense (>75%)
Displaced/unanchored and degraded project materials:
- coir rolls
- rocks
Human impacts at project site:
- foot traffic
You must be logged in to post a comment.