Infrastructure
Erosion: Moderate
Street/Road:
- Impacted
Drainage
Drainage Ditch Overflow: none
Debris
Debris/Trash: Present
Buildings
Impacts to Buildings: N
Cost incurred?: Yes
Est. cost ($): 1000
You must be logged in to post a comment.
Erosion: Moderate
Street/Road:
Drainage Ditch Overflow: none
Debris/Trash: Present
Impacts to Buildings: N
Cost incurred?: Yes
Est. cost ($): 1000