Plymouth, MA

Plymouth County






Photo description: Eroding cliff at Center Hill Preserve

Coastal resources in/directly adjacent to project footprint:

  • beach (mixed sediment)

Project elevation:

  • between MHW and mean low water (MLW)

Coastal infrastructure present at site:

  • none

Site stability:

  • eroding

Vegetative cover of project area:

  • moderate (25-75%)

Dominant vegetative type within project area: grasses

Displaced/unanchored and degraded project materials:

  • none

Human impacts at project site:

  • foot traffic

Marine-related impacts:

  • wrack
  • marine debris


03/20/2020 | 12:59 pm

Tidal Overview

3 hours 33 minutes after high tide

Data from Cape Cod Canal, Sagamore (6 miles away)

High Tide (Predicted): 9:26 am, 8.1'

Observed Predicted water level Report time

Weather Overview

Wind Speed: 13 MPH

Wind Direction: SW (215°)

Temperature: 55℉

Rainfall (Calendar Day): 0"

Rainfall (Past 24 Hours): 0.13"

(Click here for full weather details)







You must be logged in to post a comment.