Roads
Street/Road: Unspecified
Specific Impacts:
- Impassable (flood water)
Comments: Surfside inaccessible due to flooding of approach roads
Marinas and Harbors
Buildings
Hazardous Materials
Beach
State: Inaccessible
Coastal Structures
Natural Resources
Comments: Musquashcut pond level very high due to overwash and limited ability to drain because of high “low” tides
Current Response
You must be logged in to post a comment.