Photo description: End of Grove Ave Warwick RI. Looking toward Rocky Point Park.
Coastal resources in/directly adjacent to project footprint:
- beach (sandy)
- beach (mixed sediment)
- beach (cobble)
Project elevation:
- between MHW and mean low water (MLW)
Coastal infrastructure present at site:
- bulkhead/seawall
Site stability:
- unknown
Displaced/unanchored and degraded project materials:
- rocks
You must be logged in to post a comment.