Roads
Specific Impacts:
- Impacted, but passable
Marinas and Harbors
Buildings
Hazardous Materials
Beach
State: Accessible
Coastal Structures
Natural Resources
Specific Impacts:
- Damaged sand fencing
Current Response
Response:
- Utility repair
You must be logged in to post a comment.
"The Town of Swansea after talking to the DPW Engineer stated that there still needed to be snow removed"